OIL & GAS PROJECTS
SHQPF Project
Construction, Pre-Commissioning, and Commissioning completed at 1000 BBL Tukaram-1Z Quick production facility project, Satellite field, Cairn Oil and Gas. Complete EPC scope executed by S.Mark Engineering (I) Pvt. Ltd.
Design, Manufacturing, Supply, Installation & Commissioning Horizontal 2ɸ Separator
Process Capacity: 100,000 BOPD, 2.5 MMSCMD @ 4 Bar
Internals: DSS bifurcator, sand jet system, vane pack, & vortex breaker
Instrumentation: radar type LT, LG, PG, PSV
Surface features: Internal glass coating, electrical heat traced, insulation
Chemical Dosing & Filtration System
Project : Design, manufacturing, supply and installation of chemical dosing system along with site electrification
CHEMICAL DOSING SKIDS – 40 nos
•Installation, erection and commissioning of CDS designed as plug and play skids at 8 sites.
•1 m3 tanks with 5 – 300 LPH dosing @ 4 kg/cm2
DEMULSIFIER DOSING SKIDS – 9 nos
•Installation, erection and commissioning of CDS designed as plug and play skids at 9 sites.
•1 m3 tanks with 0 – 10 LPH dosing @ 10 kg/cm2
FILTRATION SYSTEM SKIDS – 2 nos
•3 stage filtration to 3um with 2 trains - 1W+1S System
•Flow rate of 50m3/h3 @ 5kg/cm2
Rajasthan : Quick Production Facility
Project : Design, manufacture, construct, install and commission QPF in EPC contract
â—¦Process packages (3-ph separator, IBH, KOD, WSD, well header), Civil (sheds, water tank), mechanical (piping, skids, loading pumps, etc.), electrical (PMCC E-house, cabling, lighting), instrumentation (control panel, automation), fire fighting system (tank, pumps, hydrants), flare stack (30m)
â—¦Commissioning and operating the system for 1 month
Early and Quick Production Facility
Oil and Gas EPC project on LSTK Basis
S. Mark has extensive experience in successfully executing LSTK Projects in the oil and gas sector
S. Mark has executed several EPF/QPF projects involving:
â—¦FEED, Process Design, System Design, Detail Engineering
â—¦Design, manufacturing, installation and commissioning
â—¦Packages, E&I Panels, Automation and Electrification
â—¦Mechanical, instrument, electrical & civil Jobs
TEST Separator + Metering Skid
Process Capacity: 100,000 BOPD, 2.5 MMSCMD @ 4 Bar
Internals: DSS bifurcator, sand jet system, vane pack, & vortex breaker
Instrumentation: radar type LT, LG, PG, PSV
Surface features: Internal glass coating, electrical heat traced, insulation.
​
EIL Approved: vessels, skid, piping package
Bath Heater & Heater Treater
S. Mark has designed, manufactured, installed and commissioned Bath Heater, Heater Treater & Heat Exchanger having different sizes & handling capacities
S. Mark equipment and solutions comply to OMR, DGMS and OISD regulations, in addition to client specific requirements
​
Client :- Selan Oil, GSPC, Cairn, HOEC, ONGC, JTI
Chemical Injection Skid Design, Manufacturing & Supply
Scope: Design, manufacturing supply and installation of chemical injection skids
â—¦Fabrication
â—¦Electrical & Instrumentation
â—¦Rotary equipment
Chemicals
â—¦Corrosion Inhibitor
â—¦Demulsifier
â—¦Biocide
â—¦Wax Inhibitor
â—¦Scale Inhibitor
Dozing Rate: 100LPH to 350LPH
MOC : SS316L (Tank, piping, valves)
Class: 300# - 1500#
SRS Sharjah Fuel Loading & Metering Skids
DESIGN, ENGINEERING, INTEGRATION, FAT AND SUPPLY OF LOADING SKID – 6 no's
LOADING TECHNOLOGY: 3 no's of bottom loading arms
PROCESS FLUID: Gasoline, Acetic Acid, Fuel Oil, Ethyl Acetate, Bitumen, Methanol, Ortho-xylene
MECHANICAL: 150 Class, 100% galvanized structure
INSTRUMENTATION: MFM, PDM, Batch controller, transmitters, control valves