OIL & GAS PROJECTS

SHQPF Project

Construction, Pre-Commissioning, and Commissioning completed at 1000 BBL Tukaram-1Z Quick production facility project, Satellite field, Cairn Oil and Gas. Complete EPC scope executed by S.Mark Engineering (I) Pvt. Ltd.

Design, Manufacturing, Supply, Installation & Commissioning Horizontal 2ɸ Separator 

 Process Capacity: 100,000 BOPD, 2.5 MMSCMD @ 4 Bar

 Internals: DSS bifurcator, sand jet system, vane pack, & vortex breaker

 Instrumentation: radar type LT, LG, PG, PSV

 Surface features: Internal glass coating, electrical heat traced, insulation

Chemical Dosing & Filtration System

Project : Design, manufacturing, supply and installation of chemical dosing system along with site electrification

CHEMICAL DOSING SKIDS – 40 nos

•Installation, erection and commissioning of CDS designed as plug and play skids at 8 sites.

•1 m3 tanks with 5 – 300 LPH dosing @ 4 kg/cm2

DEMULSIFIER DOSING SKIDS – 9 nos

•Installation, erection and commissioning of CDS designed as plug and play skids at 9 sites.

•1 m3 tanks with 0 – 10 LPH dosing @ 10 kg/cm2

FILTRATION SYSTEM SKIDS – 2 nos

•3 stage filtration to 3um with 2 trains - 1W+1S System

•Flow rate of 50m3/h3 @ 5kg/cm2

Rajasthan : Quick Production Facility

 Project : Design, manufacture, construct, install and commission QPF in EPC contract

â—¦Process packages (3-ph separator, IBH, KOD, WSD, well header), Civil (sheds, water tank), mechanical (piping, skids, loading pumps, etc.), electrical (PMCC E-house, cabling, lighting), instrumentation (control panel, automation), fire fighting system (tank, pumps, hydrants), flare stack (30m)

â—¦Commissioning and operating the system for 1 month

Early and Quick Production Facility
Oil and Gas EPC project on LSTK Basis

 S. Mark has extensive experience in successfully executing LSTK Projects in the oil and gas sector

 S. Mark has executed several EPF/QPF projects involving:

â—¦FEED, Process Design, System Design, Detail Engineering

â—¦Design, manufacturing, installation and commissioning

â—¦Packages, E&I Panels, Automation and Electrification

â—¦Mechanical, instrument, electrical & civil Jobs

TEST Separator + Metering Skid

 Process Capacity: 100,000 BOPD, 2.5 MMSCMD @ 4 Bar

 Internals: DSS bifurcator, sand jet system, vane pack, & vortex breaker

 Instrumentation: radar type LT, LG, PG, PSV

 Surface features: Internal glass coating, electrical heat traced, insulation.

​

EIL Approved: vessels, skid, piping package

Bath Heater & Heater Treater

 S. Mark has designed, manufactured,  installed and commissioned Bath Heater, Heater Treater & Heat Exchanger having different sizes & handling capacities

 S. Mark equipment and solutions comply to OMR, DGMS and OISD regulations, in addition to client specific requirements

​

Client :- Selan Oil, GSPC, Cairn, HOEC, ONGC, JTI

Chemical Injection Skid Design, Manufacturing & Supply

 Scope: Design, manufacturing supply and installation of chemical injection skids

â—¦Fabrication

â—¦Electrical & Instrumentation

â—¦Rotary equipment

 Chemicals

â—¦Corrosion Inhibitor

â—¦Demulsifier

â—¦Biocide

â—¦Wax Inhibitor

â—¦Scale Inhibitor

 Dozing Rate: 100LPH to 350LPH

 MOC : SS316L (Tank, piping, valves)

 Class: 300# - 1500#

SRS Sharjah Fuel Loading & Metering Skids

 DESIGN, ENGINEERING, INTEGRATION, FAT AND SUPPLY OF LOADING SKID – 6 no's

 LOADING TECHNOLOGY: 3 no's of bottom loading arms

 PROCESS FLUID: Gasoline, Acetic Acid, Fuel Oil, Ethyl Acetate, Bitumen, Methanol, Ortho-xylene

 MECHANICAL: 150 Class, 100% galvanized structure

 INSTRUMENTATION: MFM, PDM, Batch controller, transmitters, control valves